Christina Lake, BC
DMG Blockchain Bitcoin Mine, Christina Lake, BC
- High Voltage Substation
- Unitized Padmount Substations
- Switchgear
- Custom Control Center
- Engineering
- Project Management
- Logistics
DMG Blockchain’s BC facility stands as a model of operational efficiency and scale in the cryptocurrency mining sector, powered by a fully integrated 85 MW electrical system designed, engineered and delivered by Boundary Electric. With robust infrastructure, custom control center, and precision-engineered power distribution, the site has achieved high uptime, optimized energy usage, and rapid ROI—cementing DMG’s position as a leader in sustainable, large-scale Bitcoin mining.
Our scope also included full design-build services for warehouse shelving systems, electrical distribution infrastructure, and auxiliary systems to support ongoing site operations. The project was completed under tight timelines and challenging site conditions, showcasing our team’s ability to execute complex utility-scale electrical infrastructure with precision and reliability.