North America Tungsten

While the mine was active, North America Tungsten relied on the portable substations and transformers supplied by Boundary Electric.  Over the course of six years, custom-designed portable mining skids were manufactured in-house and delivered to the site in the Yukon.

Learn More

Bitfury

Supplied and delivered power for Bitfury's sites in Drumheller and Three Hills, AB.  Created original design for power skids and worked with 25 KV splitters.  Boundary Electric is experienced in providing power solutions for digital currency mining.

Learn More

Royal Alberta Museum

The Royal Alberta Museum based in Edmonton, Alberta, chose Boundary Electric to supply and deliver substations for the museum.  Five unit substations were specially designed for the site, transformers varying from 500 kVA - 1000 kVA.

Learn More

City of Saskatoon

The City of Saskatoon holds an annual contract to order transformers from Boundary Electric.  The city trusts in the product that Boundary Electric delivers, connecting the power for city-wide utility use.

Learn More

City of Grand Forks

The Flygt Concertor Pump is the first wastewater pump with integrated intelligence to be utilized in Canada.  Boundary Electric was contracted by the City of Grand Forks to supply and install the pump at City Park.  Boundary Electric is the proud supplier of Xylem and Flygt for the B.C. Kootenay area.

Learn More

City of Medicine Hat

The City of Medicine Hat contracted Boundary Electric for a variety or transformer types for the city.  The large order was implemented to connect power to a new storefront development.

Learn More