Diavik Diamond Mine

A work order for jumbo panels in 2010 turned into a long term business relationship between Diavik Diamond Mine and Boundary Electric.  The Northern Canadian mine knows and trusts in the quality of the product as well as the punctual delivery executed through the ice roads every year.

Learn More

City of Surrey

Boundary Electric designed, supplied, and tested the secondary unit substation at Newton Pump Station for Translink in Surrey, B.C.  The substation was prepared with BC Hydro metering, load break switch and a 2000 kVA transformer.

Learn More

Moose River Gold Mine

Organized the distribution and delivery logistics for the 10 MVA transformer along with an additional two 2 MVA transformers for the Moose River Gold Mine in Nova Scotia, Canada.

Learn More

DMG Blockchain

Partnering with DMG to build a site for cryptocurrency mining.  Organized delivery and installation for 85 MW substation at Christina Lake.  Project scope included the control center construction, 24 custom-built 2500 kVA substations, underground cabling, HV cabling, and the design and construction of the mining warehouse shelves and wiring.

Learn More